How To Frame A Garage Wall
We are going to be marking the location of each stud on them simultaneously with a small framing square that is 1 1 2 wide.
How to frame a garage wall. Last pull a measurement from the top of the 2 x 6 piece of lumber that you just installed to the ceiling of the garage. By the end of this section your frame will be secure against the concrete wall and ready for insulation and drywall. Many people with large two car garages will do this to separate a workshop space away from their car. Building garage partition walls can give you additional workspace in your home.
Those that have chosen wall coverings usually opt for drywall especially if the covering is done during the construction or remodeling of other areas of the home. Garage walls have traditionally been left alone. Attach lumber to the face of the garage wall to the edge of the garage door header. Check your local building code to see which distance is required.
To assemble the long garage wall framing components we will start with the 2 x 4 sole plate and top plate by laying lengths of 2 x 4 material side by side on the ground or garage floor. Studs wall framing members are placed on either 16 or 24 centers. Here s how you can do this. Building a garage partition wall is the same as building a wall in your home.
Cut a 2 x 6 piece of lumber and nail to the face of wall exactly in the center of the garage header. Homeowners have worried less about aesthetics and went for function hiding walls with shelving. The small walls on each side of an overhead garage door need additional beefy bracing to tie the walls to the foundation as well as the header to the wall talk to your local building official for details. Step one measuring you want to start by measuring.